The trunk line of Hulin-Changchun natural gas pipeline project starts from Hulin, Heilongjiang Province and ends in Changchun, Jilin Province, with a total length of about 795 kilometers. After the completion of this project, it will be interconnected with the natural gas backbone pipeline network in Northeast China, further expanding the national oil and gas northeast passage, driving the economic development in Northeast China and greatly improving the supply guarantee capacity of the energy passage in eastern China.
Suhigo provided crawler crane and other equipment for Jiangsu Youjian (Hulin-Changchun) natural gas pipeline project to meet the requirements of trench operation.
This series of equipment can work in heavy sand and dust environment, rain, snow, fog and other weather.
The whole machine is reasonable in design, compact in structure, easy to dispatch, transfer and transport, and suitable for construction sites and general road operations.
Suhigo's equipment: Crawler Pipelayer
Suhigo provides Crawler Pipelayer to support construction sites in Iraq. Our equipment has stable performance, easy operation and easy maintenance, which provides strong support for the smooth progress of the project.
Suhigo's equipment: rotated pipelayer, trencher, conveyor pulley, etc
Suhigo provides pipeline construction equipment such as rotated pipelayer, trencher and conveyor pulley for the Tilenga EPSCC project in Uganda, which is the main oil-producing block in the development of Lake Albert oil and gas field in Uganda. The southern inter-well pipeline started construction this time is 98.4 km long. It includes cluster well sites and inter-well pipelines, water intake pipelines, lake water intake facilities, and Nile directional drilling. After the completion of the project, it will help Uganda become an important crude oil producer in East Africa and is of great significance to promoting Uganda's oil exports and international energy cooperation.
Suhigo's equipment: Crawler Pipelayer
Suhigo provides Crawler Pipelayer, stable performance, easy to operate, easy to maintain equipment to facilitate the smooth progress of the project!
Suhigo's equipment: Crawler Pipelayer, Paywelder, etc
Suhigo provided Crawler Pipelayer, Paywelder and other construction equipment for the gasification Southern Xinjiang natural gas pipeline project. The gasification Southern Xinjiang natural gas pipeline project was fully started, marking the start of construction of the 2,108-kilometer gasification Southern Xinjiang natural gas pipeline project. The project will be carried out in three batches. The natural gas pipeline network will connect nine counties and cities along the route, such as Kashgar and Aksu, and the maximum daily gas supply capacity will be increased from the current 27 million cubic meters to 58 million cubic meters, realizing the new pipeline and the Southern Xinjiang Natural Gas Benefit Project and other existing gas supply pipelines, greatly improving the natural gas supply capacity in Southern Xinjiang, benefiting nearly 10 million people of all ethnic groups.
Suhigo's equipment: Pipe Bevelling Machine
Suhigo provided bevelling machine equipment support for Liaohe Oil Construction - West to East Gas Transmission Middle Line Section (Zhongwei - Ji'an) project
Total length: 68.8 kilometers
Diameter : 914mm
Suhigo's equipment: Anti-corrosion equipment
Suhigo cooperated with Sinopec Henan Oil Construction Engineering Co., Ltd. to provide mechanized anti-corrosion equipment for the Anhui Northeast Natural Gas Pipeline Project; The project undertaken by Henan Oilfield Construction has a total length of 68.8 kilometers and a diameter of 914mm. After completion, it will deepen the integrated development of the Yangtze River Delta, coordinate the promotion of infrastructure interconnection, and further promote the comprehensive and high-quality development of natural gas in Anhui Province.
Suhigo's equipment: Pipelayer
Suhigo provided Pipelayer for Xinjiang Oil Construction -West to East Gas Transmission 4 Line pipeline project (Turpan-Zhongwei section); Meet the requirements for trench laying operation